Loading the content...
Navigation

31 MW GE LM2500+ Gas Turbine Generator Package

Return to Previous Page
Description

Product Description

31 MW GE LM2500+ Gas Turbine Generator Package

General Electric LM2500+HSPT 31132 kW, Commissioned in 2004, Natural Gas, Brush Generator rated at 47500 KVA, 50 HZ, 11500 V, can be upgraded to dual fuel system. Next overhaul hours are required after 3579 running hours. electrical system, control system, cooling system, starting system, exhaust system,  lubricating system, pumps, Turbine package can be put into service or used for spares for an already existing plant. Complete package very well maintained. Contact us to set up inspection. This plant is priced well below market value and can be purchased at an excellent price.

 

31 MW LM2500 Gas Turbine Generator Package

31 MW LM2500 Gas Turbine Information

 

LM2500 Gas Turbine Fact Sheet

LM2500 Gas Turbine Fact Sheet

GE Gas Turbine Design Features and Benefits

GE Gas Turbine Design Features and Benefits

 

GAS TURBINE GENERATOR LM2500+ ( 31,132 MW )

 GAS TURBINE

 Manufacturer:                  General Electric

Despatched by:                General Electric

Model Num.:                     LM2500+HSPT

Nominal Power:               31132 kW

Fuel:                                   Natural Gas

Production Date:             2003

Compressor stages:        17

Power Turbine stages:    2

 

LM2500 GENERATOR

 Manufacturer:                  BRUSH

Production Date:             2003

Cooling:                             Air-Cooled

Insulation Class:              F

Operation mode:              Continuous

Operation power:             47500 kVA

Operation Voltage:           11500 V

Operation Current:           2385 A

Power Factor:                    0.8

Speed:                                1500 rpm

Frequency:                        50 Hz

Field Voltage:                   99 V

Field Current:                   970 A

Standars:                          IEC 60034-1

IP Class:                            IP54

Ambient Temp.:               15 deg. C

Operatiion Altitude:      <1000 m.

 

 

GAS TURBINES
UNIT MANUFACTURER MODEL DATE OF COMMISIONING CAPACITY EFFICIENCY HEAT RATE AUXILIARY CONSUMPTION
NOMINAL (MW) Projected at full load, (%) Real at full load, (%) Real at full load, (Kj/kW-hr) (%)
GTG GE LM2500+ HSPT Feb 2004 31.1 38.2 36 0,294 1,5%

 

GTG (Natural Gas ) Control system have duel fuel system and engine can be upgraded to duel fuel system if required.

GG Engine Running Hours : 69587 / Package Running Hours : 74659

HSPT Engine Running Hours:  68720 / Package Running Hours: 74659

 

Routine Maintenance Intervals

4000 Hours /6 Months = Semi-Annual Inspection

12500 Hours = VSV Bushing Replacement

25000 Hours = Hot Section Exchange

25000 Hours = HSPT Statory Kit Replacement (for  GTG-HSPT  )

50000 Hours = Major Overhaul Inspection

 

Status of Overhaul Maintenance of Units:

GG overhaul done @ 48166 running hours

HSPT  overhaul done @48166 running hours

 

Running Hours after Overhaul:

GG : 21421 Hours

HSPT : 20554 Hours

 

Next Overhaul Hours for Units:

HSE for GG after 3579 running hours, MOI after 28579 running hours,

HSE for  HSPT after 4446 running hours, MOI after 29446 running hours,

 

Start-stop number for units:

1699 fired starts, 1443 normal stops

 

Gas Consumption values:

0,287 Sm3/kW

 

31 MW- GE LM2500+ Gas -Turbine -Generator-assembly31 MW- GE LM2500+ Gas -Turbine -Generator- disassembled31 MW- GE LM2500+ Gas -Turbine -Generator- Package- Exhaust31 MW- GE LM2500+ Gas -Turbine -Generator- Power Yard System31 MW- GE LM2500+ Gas -Turbine -Generator-Transformers

31 MW- GE LM2500+ Gas -Turbine -Generator- Package-Building

31 MW- GE LM2500+ Gas -Turbine -Generator- Package

Related Products

Quick View

32 MW GE TM 2500 Mobile Gas Turbines

32 MW GE TM 2500 Mobile Gas Turbines Three (3) New / Unused GE TM2500 Plus Mobile Gas Turbine Generators Rating: ISO rated at 32 MW each Warranty: Complete with original factory warranty   TM...
Quick View

6 x 42 MW GE 6581B Gas Turbine Generators

6 x 42 MW GE 6581B Gas Turbine Generators Used Six (6) GE Frame 6B Dual fuel turbine packages (2) 42 MW 6581B Dual Fuel Turbines, (2) 40 MW 6581B Dual Fuel Turbines and (2)...
Quick View

72 MW Westinghouse Gas Turbine Generator Plant

72 MW Westinghouse Gas Turbine Generator Plant Complete 47 MW Westinghouse W251-B11 Gas Turbine with a brush electric generator, 3000 rpm, 50 HZ, 11.5 KV, Natural Gas Fuel, Complete power plant 25 MW Mitsubishi Steam...
Quick View

205 MW Siemens SGT-800 Gas Turbine Power Plant

205 MW Siemens SGT-800 Gas Turbine Power Plant Three (3) Siemens SGT 800 Gas Turbines 3000 rpm, 50 HZ One (1) Siemens SST-900 Steam Turbine Three (3) Aalborg-Denmark HRSG One (1) SPX-Belgium ACC Commissioned :...
Quick View

46 MW LM6000 PC Sprint Gas Turbine Power Plant

46 MW LM6000 PC Sprint Gas Turbine Power Plant Complete plant with 46 MW LM6000 PC Sprint Gas Turbine, Brush Turbo Generator, 60 MT/HR (HRSG), Fuel: Natural Gas, 17,970 hrs. since overhaul, Year of commissioning...
Quick View

GE LM6000 Gas Turbine Power Plant 120 MW

GE LM6000 Gas Turbine Power Plant 120 MW About GE LM6000 Gas Turbine The LM6000 gas turbine is a simple-cycle, two-shaft, high thermal performance industrial gas turbine and is recognized at the top of its class...
Quick View

25 MW Trailer Mounted Mobile Gas Turbines

25 MW Trailer Mounted Mobile Gas Turbines Five (5) 25 MW Pratt and Whitney Dual Fuel (Diesel or Gas) Trailer Mounted Gas Turbine Generators. Slightly Used  with Less than 500 total running hours on each...
Quick View

20 MW Solar Mars 100 Gas Turbine Package

20 MW Solar Mars 100 Gas Turbine Package TWO (2) 10 MW SOLAR MARS 100 GAS TURBINE PACKAGES, hours on exchange engines: 12783 and 17000  hours, Frequency: 50 HZ, Year 1996, started system, exhaust system, cooling system,...
Quick View

65 MW ABB GT10 Gas Turbine Power Plant

65 MW ABB GT10 Gas Turbine Power Plant Alstom has been a leader in the world of gas turbine technology and in 1956  they introduced to the world the first combined cycle plant. Since then,...
Back to top