Loading the content...
Navigation

72 MW Westinghouse Gas Turbine Generator Plant

Return to Previous Page
Description

Product Description

72 MW Westinghouse Gas Turbine Generator Plant

  • Complete 47 MW Westinghouse W251-B11 Gas Turbine with a brush electric generator, 3000 rpm, 50 HZ, 11.5 KV, Natural Gas Fuel, Complete power plant
  1. 25 MW Mitsubishi Steam Turbine, Steam pressure: 86 bar/1260 psi
  2. Boiler; Aalborg Keystone HP/LP System
  3. Electrical System
  4. Exhaust System
  5. Starting System
  6. Cooling System
  7. Transformers
  • The 72 MW Westinghouse Gas Turbine Generator Plant is being offered with OEM overhaul with zero hrs. of run time. Plant has been well maintained since new.

 

GAS TURBINE

Manufacture Westinghouse
Model 251-B11
Rated Output 47 MW
Commission Date 1998
Total Working Hours 92963
Major Overhaul Dec. 2012
Hours after Overhaul 0
Fuel Natural Gas
   

GENERATOR

Manufacture Brush Electric Machines Ltd
Type CRA
Rated Output 56 MW
Frequency 50 HZ
Voltage 11.5 KV
Power Factor 0.85 PF.
Cooling Fan Capacity 1080 m3 / min.

 

STEAM TURBINE

Manufacture Mitsubishi heavy Industries Ltd
Type Extraction Mixed Pressure Condensing
Rated Output 25 MW
Commission Date 2000
Rotating Speed 3000
Main Steam Pressure (max) 1260 PSI
Main Steam Temperature (max) 950 F
Mixing Steam Pressure 50 to 90 PSI
Mixing Steam Temperature (max) 475 F
   

GENERATOR

Manufacture Mitsubishi heavy Industries Ltd
Type MB
Rated Output 29059 KVA
Voltage 11500 V
Rated Current 14359 A
Rotating Speed 3000
Frequency 50
Power Factor 0.85 PF.
Inlet Air Temperature 40 C
Temperature Rise Limit Stator 84 degrees C, Rotor 80 degrees C
Exciter volt 280
Exciter Amperage 552
Cooling Fan Capacity 660 m3 / min.

 

 

BOILER

Manufacture Aalborg Keystone Inc.

HP Drum

Unit Type HRSG HP System
Max. Working Pressure 100 bar / 1440 PSIG
Max. Steaming Capacity 87 ton/ hr. – 174.788 LBS/HOUR
Boiler Heating Surface 321.704 SQ.FT

LP Drum

Unit Type HRSG LP System
Max. Working Pressure 11 bar / 150 PSIG
Max. Steaming Capacity 28 ton/ hr. – 56.908 LBS/HOUR
Boiler Heating Surface 267.371 SQ.FT
   

 

72 MW Westinghouse Gas Turbine power plant

72 MW turbine generator plant installed view

 

 

Related Products

Quick View

80 MW Pratt & Whitney FT8 Turbine Plant

80 MW Pratt & Whitney FT8 Turbine Plant 80 MW Pratt & Whitney FT8 Combined Cycle Power Plant is Two (2) 29 MW Pratt & Whitney FT8-3 Swift pack single shaft gas turbines with air cooled...
Quick View

40 MW LM6000 PC Gas Turbine

40 MW LM6000 PC Gas Turbine The GE LM6000 aeroderivative gas turbine is world renowned for it chameleon design qualities that can adapt to any industrial challenge. The versatile light weight LM6000 gas turbine of...
Quick View

205 MW Siemens SGT-800 Gas Turbine Power Plant

205 MW Siemens SGT-800 Gas Turbine Power Plant Three (3) Siemens SGT 800 Gas Turbines 3000 rpm, 50 HZ One (1) Siemens SST-900 Steam Turbine Three (3) Aalborg-Denmark HRSG One (1) SPX-Belgium ACC Commissioned :...
Quick View

46 MW LM6000 PC Sprint Gas Turbine Power Plant

46 MW LM6000 PC Sprint Gas Turbine Power Plant Complete plant with 46 MW LM6000 PC Sprint Gas Turbine, Brush Turbo Generator, 60 MT/HR (HRSG), Fuel: Natural Gas, 17,970 hrs. since overhaul, Year of commissioning...
Quick View

124 MW GE PG 6591 Gas Turbine Power Plant

124 MW GE PG 6591 Gas Turbine Power Plant The Advantages of the Frame GE PG 6 Gas Turbine: The GE frame 6 turbine is used worldwide in in a wide range of applications; such...
Quick View

25 MW Trailer Mounted Mobile Gas Turbines

25 MW Trailer Mounted Mobile Gas Turbines Five (5) 25 MW Pratt and Whitney Dual Fuel (Diesel or Gas) Trailer Mounted Gas Turbine Generators. Slightly Used  with Less than 500 total running hours on each...
Quick View

GE LM6000 Gas Turbine Power Plant 120 MW

GE LM6000 Gas Turbine Power Plant 120 MW About GE LM6000 Gas Turbine The LM6000 gas turbine is a simple-cycle, two-shaft, high thermal performance industrial gas turbine and is recognized at the top of its class...
Quick View

32 MW GE TM 2500 Mobile Gas Turbines

32 MW GE TM 2500 Mobile Gas Turbines Three (3) New / Unused GE TM2500 Plus Mobile Gas Turbine Generators Rating: ISO rated at 32 MW each Warranty: Complete with original factory warranty   TM...
Quick View

80 MW LM2500 Gas Turbine Power Plant

80 MW LM2500 Gas Turbine Power Plant Complete plant with (2) Two 30 MW LM2500 + Gas Turbines, (2) Two Steam Turbines, HRSG (Heat Recovery Steam Generators), 11 KV, 50HZ, Plant installed in 2005, Dual...
Quick View

20 MW Solar Mars 100 Gas Turbine Package

20 MW Solar Mars 100 Gas Turbine Package TWO (2) 10 MW SOLAR MARS 100 GAS TURBINE PACKAGES, hours on exchange engines: 12783 and 17000  hours, Frequency: 50 HZ, Year 1996, started system, exhaust system, cooling system,...