Loading the content...
Navigation

50 MW GE LM6000 Gas Turbine

‹Return to Previous Page
Description

Description

50 MW GE LM6000 Gas Turbine

Plant consist of 43 MW LM6000 PC Gas Turbine, HRSG, 12.83 MW Steam Turbine, Year 2002, Fuel Natural Gas, 50 HZ, 11 KV, Complete Plant well maintained since installation. Item: C77GT

 

pdf

pdf

Related Products

LM6000 PC Sprint Gas Turbine 46 MW

LM6000 PC Sprint Gas Turbine 46 MW LM6000 PC Sprint Gas Turbine 46 MW, 11.5 KV, 50 HZ, very well maintained 46 MW LM6000 PC Sprint Gas Turbine, Brush Turbo Generator, Fuel: Natural Gas, 17,970 hrs. since overhaul, Year of commissioning 2006, HRSG: 60 MT/HR, transformers, electrical system, electrical panels,...

Siemens SGT-800 Gas Turbine 205 MW

Siemens SGT-800 Gas Turbine 205 MW   Siemens SGT-800 Gas Turbine 205 MW, Three (3) SGT-800 Gas Turbines, One (1) Siemens SST-900 Steam Turbine, Three (3) Heat Recovery Generators, commissioned in 2013, Complete power plant with all auxiliary equipment. Power station is in excellent condition. Also available engineering services for dismantling and commossiong...

LM 6000 Gas Turbine

LM 6000 Gas Turbine  46 MW GE LM 6000 PC Sprint Gas Turbine, Brush Turbo Generator, Complete CHP plant Natural Gas, can be easily converted to dual fuel, 11.5 KV, 50 HZ, Year of commissioning 2006, total running hours  43970 hrs., transformers, electrical systems, electrical panels, control systems, air system,...

Solar Titan T130 Gas Turbine Plant

Solar Titan T130 Gas Turbine Plant Solar Titan T130 Gas Turbine Plant. 54 MW  Solar Titan 130 Combined Cycle Power Plant is unused in New condition. The plant operates at 50 HZ frequency and designed to run on Syngas or Natural Gas Fuel. The turbines have been specially designed to...

31 MW GE LM2500 Gas Turbine

31 MW GE LM2500 Gas Turbine  Parts or Repair LM2500 Gas Turbine General Electric LM2500+HSPT 31132 kW, Commissioned in 2004, Natural Gas, Brush Generator rated at 47500 KVA, 50 HZ, 11500 V, electrical system, control system, cooling system, starting system, exhaust system,  lubricating system, pumps, Turbine package can be put...

GE LM6000 Gas Turbine 60 MW

GE LM6000 Gas Turbine 60 MW GE LM6000 gas turbine 60 MW, 50 MW LM6000 PC Sprint, Year: 2011, 7000 hrs since new, 3000 rpm, 50 HZ,  13 MW Siemens SST 300 steam turbine with only 5000 hrs.,  LM6000 Gas Turbine power plant was put into operation in 2012. Excellent condition...

72 MW Westinghouse Gas Turbine

72 MW Westinghouse Gas Turbine  Complete 47 MW Westinghouse W251-B11 Gas Turbine with a brush electric generator, 3000 rpm, 50 HZ, 11.5 KV, Natural Gas Fuel, Complete power plant 25 MW Mitsubishi Steam Turbine, Steam pressure: 86 bar/1260 psi Boiler; Aalborg Keystone HP/LP System Electrical System Exhaust System Starting System...

LM2500 Gas Turbine Generator

LM2500 Gas Turbine Generator Complete 25 MW LM2500 SAC Gas Turbine Generator Package with all auxiliary equipment. The gas turbine was in operation for 2500 hours, year 2001, 50 HZ, Natural Gas Fuel. Storage has been in a climate controlled warehouse. The LM2500 turbine has had a recent inspection done,...

GE 6FA Gas Turbine

GE 6FA Gas Turbine GE 6FA Gas Turbine 81 MW, simple cycle. Only 1000 hours of operation since New. Power plant was used for peaking operation. 50 HZ, Year of manufacture 2011, complete turbine package. Complete plant is in excellent condition just like new. more info GAS TURBINE Turbine Manufacture:...

LM2500 Gas Turbine Plant 80 MW

LM2500 Gas Turbine Plant 80 MW LM2500 Gas Turbine Plant 80 MW, Complete plant with (2) Two 30 MW LM2500 + Gas Turbines, (2) Two Steam Turbines, HRSG (Heat Recovery Steam Generators), 11 KV, 50 HZ, Plant installed in 2005, Dual Fuel: Natural Gas (NG) and Liquid Fuel, Hours run...
Back to top