Two (2) 10150 KW (12688 KVA) Wartsila 20V32TS, 4 stroke turbocharged Diesel Engines (HFO/LFO) configuration with ABB Heavy Duty Generators, New unused, 750 RPM, 50 HZ, 0.8 PF, 15 KV. Year 2018. The total 20.3 MW of electrical power.

The Balance of the Plant will include:  HFO and LFO Fuel Oil System, Lubricating Oil System, Cooling system,  Compressed Air System, Intake air system, Exhaust System, Oily Water System, Water Treatment System, Fire Protection System, Heat Recovery System, Emission Monitoring System, Electrical System, Control System, Voltage System, Piping, Cables and Accessories.

The power plant is New and was never used. The plant was manufactured in 2018 and in manufactures shipping crates. Available from a cancelled project.

Wartsila Brochure

Scope of Supply

Wartsila 20V32TS Diesel Generators

Wartsila information 20V32

Generator Set
Engine
Description QTY Responsibility of Seller Responsibility of Buyer
Wärtsilä 20V32TS engine 2 x  
Common base frame 2 x  
Flexible connection 2 x  
Generating set assembly 2 x  
Set steel springs 2 x  
Engine maintenance platform – prefabricated 2 x  
Generator
Generator – 15000 V 2 x  
Flexible coupling 2 x  
Flywheel cover 2 x  
External enclosure incl. surge capacitors and lightning arresters 2 x  
MECHANICAL AUXILIARY SYSTEMS
Auxiliary Modules
Engine auxiliary module – W32 3.0 1-C S HFO 2 x  
EAM appendix 2 x  
Exhaust gas module – W32 EGM 1-C 2 x  
EAM platform – W32-EAM 2 x  
FUEL SYSTEM
Light Fuel Oil System
LFO unloading pump unit 3.0 – double, 24 m³/h     x
LFO storage tank – 300 m³     x
LFO transfer pump unit – double, 20.1 m³/h     x
LFO day tank – 150 m³     x
LFO day tank equipment     x
LFO flow meter for individual engine fuel consumption measurement – 4 m³/h 2 x  
Light Fuel Oil System Piping
Piping and valves – light fuel oil system     x
Piping and valves for black start unit – LFO system     x
Heavy Fuel Oil System
HFO unloading pump unit 3.0 – double, 35 m³/h     x
HFO flow meter for unloading measurement (mounted on the

unloading pump unit)

1 x  
HFO storage tank – 2500 m³ 1   x
HFO storage tank equipment 1   x
HFO transfer pump unit 3.0 – double, 22 m³/h 1   x
HFO storage tank suction heater 1   x
HFO buffer tank – insulated, 80 m³ 1   x
HFO buffer tank equipment 1   x
HFO separator unit – triple, SAF977 1   x
HFO day tank – insulated, 150 m³ 1   x
HFO day tank equipment 1   x
W32 Engine fuel booster 3.0 – HFO S 6 x  
HFO/LFO feeder 3.0 – steam, 22 m³/h 1   x
Heavy Fuel Oil Piping
Piping and valves – insulated, heavy fuel oil system 1   x
Steam trace heating material – heavy fuel oil system 1   x

LUBRICATING OIL SYSTEM

LO unloading pump unit – single, 8.1 m³/h 1   x
LO loading pump unit – single, 8.1 m³/h 1   x
LO storage tank – horizontal, 10 m³ 2   x
LO service tank – horizontal, 7 m³ 1   x
Used LO storage tank – horizontal, 20 m³ 1   x
LO transfer pump unit stationary – double, 8.1 m³/h 1   x
LO transfer pump unit mobile, 8.1 m³/h 2   x
LO separator unit – PAF636 2 x  
Oil mist separator – double, high efficiency 2 x  
LO heat exchanger (mounted on the engine) 2 x  
LO thermostatic valve (mounted on the engine) 2 x  
Lubricating Oil System Piping
Piping and valves – lubricating oil system     x
COMPRESSED AIR SYSTEM
Instrument air compressor unit – 132 m³/h 2   x
Instrument air bottle – 0.27 m³ 2   x
Starting air compressor – double, electric, XA120, 110 m³/h 1   x
Starting air bottle – 4.8 m³ 2   x
Compressed Air System Piping
Piping and valves – compressed air system 1   x
COOLING SYSTEM
Set radiator – low noise 2 x  
Set cooling radiator ladder and railings 1   x
LT expansion vessel (mounted on the EGM) – 600 l 2 x  
Maintenance water tank – 6 m³ 1   x
HT preheating unit (mounted on the EAM) – steam, 240 kW 2 x  
LT thermostatic valve (mounted on the EAM) 2 x  
HT thermostatic valve (mounted on the EAM) 2 x  
Cooling System Piping
Piping and valves – cooling system 1   x
INTAKE AIR SYSTEM
Charge air filter 2 x  
Rain hood for charge air filter 2 x  
Charge air silencer (mounted on the EGM) – 35 dB(A) 4 x  
Charge air ducting 4 x  
EXHAUST SYSTEM
Exhaust gas branch pipe (mounted on the EGM) 2 x  
Exhaust gas silencer – 35 dB(A) 2 x  
Exhaust gas bellows – DN1100 8 x  
Exhaust gas ducting – insulated 1   x
Exhaust gas stack pipe – insulated, DN1100 2 x  
OILY WATER SYSTEM
Oily water transfer pump unit 2   x
Oily water buffer tank – electric heating, 35 m³ 1   x
Oily water feed pump unit – 1.5 m³/h 1   x
Oily water treatment unit – 0.75 m³/h 1   x
Sludge tank – 35 m³ 1   x
Sludge transfer pump unit – 6 m³/h 1   x
Oily Water System Piping
Piping and valves – insulated, oily water system 1   x
Steam trace heating material – oily water system

 

1   x

WATER TREATMENT SYSTEM

Water treatment unit – container type 1   x
Treated water storage tank – stainless steel, vertical, 35 m³ 1   x
Treated water storage tank equipment 1   x
Water booster unit – 10 m³/h 2   x
Tie in for raw water at power plant fence 1   x
Tie in for potable water at power plant fence 1   x
Water Treatment System Piping
Piping and valves – water treatment system 1   x
Tie-in point for raw water 1   x
FIRE PROTECTION SYSTEM
Pump station 1   x
Tie-in point for fire water 1   x
Integration of alarm systems between Phase 1B and Phase 2 Power Plant 1   x
Fire / raw water tank – 1000 m³ 1   x
Fire / raw water tank equipment 1   x
Outdoor hydrant   x  
Outdoor hose cabinet 2 x  
Portable fire extinguisher – dry powder, 12 kg 3 x  
Piping and valves – fire protection system, other power plant areas 1   x
Underground piping and valves – polyethylene, fire protection system, other power plant areas 1   x
Fire Protection, Fuel Storage Area
Foam application for vertical fuel tank 1   x
Tank exposure protection with water spray 1   x
Outdoor hydrant with monitor 1 x  
Outdoor hose cabinet 1 x  
Portable fire extinguisher – dry powder, 12 kg 1 x  
Piping and valves – fire protection system, fuel storage area 1   x
Foam system piping and valves – fire protection system, fuel  storage area 1   x
Tank water spray piping and valves – fire protection system, fuel storage area 1   x
Fire Protection, Day Tank Area
Foam application for vertical fuel tank 1   x
Piping and valves – fire protection system, day tank area 1   x
Foam system piping and valves – fire protection system, day

tank area

1   x
Fire Protection, Engine Hall
Wet pipe sprinkler system – engine hall 1   x
Indoor hydrant 2 x  
Standpipe hose cabinet 2 x  
Portable fire extinguisher – dry powder, 12 kg 6 x  
Mobile foam unit 2   x
Piping and valves – fire protection system, engine hall 1   x
Fire Protection, Electrical Equipment Building
Portable fire extinguisher – CO₂, 5 kg 2 x  
Portable fire extinguisher – CO₂, 20 kg 2   x
Portable fire extinguisher – dry powder, 12 kg 2   x
Fire Protection, Fuel Treatment House
Wet pipe sprinkler system – fuel treatment house (type 3) 1   x
Portable fire extinguisher – dry powder, 12 kg 3 x  
Portable fire extinguisher – dry powder, 50 kg 1   x
Fire Protection, Guard House
Portable fire extinguisher – dry powder, 6 kg 1   x
Fire Protection, Workshop and Warehouse
Hose reel 2   x
Portable fire extinguisher – CO₂, 5 kg 2   x
Portable fire extinguisher – dry powder, 6 kg 3 x  
Portable fire extinguisher – dry powder, 12 kg 5 x  
Fire Protection, Administration Building
Hose reel 2   x
Fire blanket 1   x
Portable fire extinguisher, dry powder, 6 kg 5 x  
Fire Protection, Fuel Unloading Station
Portable fire extinguisher – dry powder, 12 kg 1   x
Portable fire extinguisher – dry powder, 50 kg 1   x
Fire Protection, Heat Recovery Container
Portable fire extinguisher – dry powder, 12 kg 1   x
Fire Protection, Black Start Unit Container
Portable fire extinguisher – dry powder, 12 kg 1   x
Fire Protection, Station Auxiliary Transformer Area
Portable fire extinguisher – dry powder, 12 kg 2   x
Fire Protection, Power Transformer Area
Transformer protection with fixed water spray 2   x
Portable fire extinguisher – dry powder, 12 kg 2   x
PIPE SUPPORTS AND CROSSOVERS
Pipe secondary supports (set) 1   x
Fuel storage area berm crossover 2   x
Day tank area concrete wall crossover 3   x
Pipe route crossover 1   x
Cooling pipe crossover 2   x
Cable bridge crossover  1   x
Fire water container pipe crossover 1   x
Heat recovery container pipe crossover 1   x
HEAT RECOVERY SYSTEM
Steam Generation System
Steam Generation System For Fuel Heating
Own consumption exhaust gas boiler – HU-2A 2 x  
Exhaust gas bellows – DN1100 2 x  
Auxiliary container – 40 feet 1   x
Blow down tank – BDT-400 1   x
Oil detector – in auxiliary container, conductivity sensor 1   x
LFO day tank for auxiliary boiler – 4 m³ 1   x
Steam header 1   x
Condensate return tank with pump – 2 m³ 1   x
Boiler washing water tank – with pump, 10 m³ 2   x
Steam Generation System For Fuel Heating Piping
Piping and valves – insulated, steam system 1  

 

x
EMISSION MONITORING SYSTEM
Continuous Emission Monitoring System
Shelters for analyser and sample conditioning system with AC 1 x  
Sample probes and heated sampling line – max 30 meters

(included on analyzer)

     
Sample conditioning system (included on analyzer) 2 x  
Gas analyser – NOx, O2, SO2, CO monitoring     2 x  
Opacity monitor  2 x  
Emission reporting and data acquisition system 1 x  
ELECTRICAL SYSTEMS
Control System
Operator Station
WOIS workstation 1 x  
WOIS station for Phase 1B control 1 x  
WISE workstation 1   x
Uninterruptible power supply 1   x
Control Panels
Central common control panel 1   x
Central generating set control panel 1 x  
Local generating set control panel 2 x  
Auxiliary module panel (mounted on the EAM)

 

2 x  
Cables And Accessories
Control cables – fuel and oil unloading area 1   x
Control cables – fuel storage area 1   x
Control cables – fuel treatment house 1   x
Control cables – day tank area 1   x
Control cables – engine hall 1   x
Control cables – outdoor auxiliary area 1   x
Control cables – other power plant areas 1   x
Control cables – electrical equipment buildings 1   x
Control cables – station auxiliary transformer area 1   x
Control cable from Phase 1B to Phase 2 – Material 1   x
Control cables – power transformer area 1   x

 

Medium Voltage System
Main busbar – 17.5 kV, 4000 A, 50 kA 1 x  
Generator cubicle – 630 A, 50 kA 2 x  
Outgoing feeder cubicle – 4000 A, 50 kA 1 x  
Outgoing feeder cubicle – 630 A, 50 kA 1   x
Step-up transformer cubicle – 4000 A, 50 kA 1 x  
Station auxiliary transformer cubicle – 630 A, 50 kA 1 x  
Measuring cubicle – 50 kA 1 x  
Bustie cubicle – 4000 A, 50 kA 1   x
Generator neutral point cubicle – 5 A 2 x  
Medium Voltage Cables
Medium voltage power cables 1   x
Low Voltage System
Station auxiliary transformer – 2500 kVA 1 x  
Black start unit – 504 kW 1   x
Low voltage switchgear 1   x
Frequency converter – cooling radiator, 132 kW, 261 A 2 x  
Frequency converter – HFO separator 1 x  
Frequency converter – engine hall inlet ventilation auxiliary side, 

11 kW, 23 A

2 x  
Frequency converter – engine hall inlet ventilation generator

side, 18.5 kW, 38 A

2 x  
Low Voltage Cables
Low voltage power cables 1   x
DC SYSTEM
DC system – 110 V 1 x  
DC system switchyard control 1   x
High Voltage System
Step-up transformer
Step-up transformer 15/33kV 92MVA 2   x
PLANT ELECTRIFICATION AND EARTHING
Cable Raceways
Cable raceways 1   x
CCTV System
CCTV 1   x
Earthing Above 0-Level
Earthing above 0-level 1   x
Fire Detection System
Fire detection – fuel and oil unloading area 1   x
Fire detection – fuel treatment house 1   x
Fire detection – engine hall 1   x
Fire detection – outdoor auxiliary area 1   x
Fire detection – other power plant areas 1   x
Fire detection administration building – other power plant areas 1   x
Fire detection guard house – other power plant areas 1   x
Fire detection workshop and warehouse – other power plant

areas

1   x
Fire detection – electrical equipment buildings 1   x
Fire detection – station auxiliary transformer area 1   x
Integration of alarm systems between Phase 1B and Phase Power Plant 1   x
IT-Networks
IT-network 1   x
LIGHTING AND BUILDING ELECTRIFICATION
Lighting and building electrification – fuel and oil unloading area 1   x
Lighting and building electrification – fuel storage area 1   x
Lighting and building electrification – fuel treatment house 1   x
Lighting and building electrification – day tank area 1   x
Lighting and building electrification – engine hall 1   x
Lighting and building electrification – outdoor auxiliary area 1   x
Lighting and building electrification – other power plant areas 1   x
Lighting and building electrification administration building – other power plant areas 1   x
Lighting and building electrification guard house – other power

plant areas

1   x
Lighting and building electrification workshop and warehouse –  other power plant areas 1   x
Lighting and building electrification – electrical equipment buildings 1   x
Lighting and building electrification – station auxiliary transformer area 1   x
Lightning Protection
Lightning protection 1  

 

x
TOOLS
Set engine maintenance tools 2   x
Set engine hand tools 1   x
Set tools for turbocharger 1   x
Set HFO separator tools 1   x
Set LO separator tools 1   x
Separator cleaning device unit 1   x
Separator cleaning device liquid 1   x
Workshop tools 1   x
Fuel oil and lubricating oil test kit 1   x
Tools for electrical equipment 1   x
Spare Parts
Commission consumable engine parts 1   x
Set of capital spare parts: 2 Cylinder heads, 2 Injection pumps,

2 Injection valves, 1 Generator operational spare part package (includes the AVR)

1   x
CIVIL
Civil Structures And Material
Engine Hall Structure
Substructures 1   x
Superstructures 1   x
Process ventilation 1   x
Cranes 1   x
Electrical Equipment Buildings
Electrical Equipment Building or Control Building Substructures 1   x
Superstructures 1   x
HVAC 1   x
Fuel Treatment House Structure
Substructures 1   x
Superstructures 1   x
HVAC 1   x
Cranes 1   x
Ancillary Buildings And Structures
Fire Fighting Container/Pump House
Substructures 1   x
Oil Waste Handling Facilities
Substructures 1   x
Water Treatment Tanks And Structures
Substructures 1   x
Sewage Treatment And Pumping Stations
Substructures 1   x
Workshop And Warehouse
Substructures 1   x
Superstructures 1   x
Cranes 1   x
Administration Building
Substructures 1   x
Superstructures 1   x
HVAC 1   x
Guard House
Substructures 1   x
Superstructures 1   x
HVAC 1   x
Fuel And Oil Uploading Station
Substructures 1   x
Superstructures 1   x
Weigh bridge and shelter 1   x
Fuel Storage Structure
Substructures 1   x
Slab and wall 1   x
Day Tank Structures
Substructures 1   x
Slab and wall 1   x
Outdoor Auxiliary Structures
Ventilation Unit Platform
Superstructures 1   x
Heat Recovery System
Substructures 1   x
Superstructures 1   x
Exhaust Gas Duct Supports
Substructures 1   x
Superstructures 1   x
Exhaust Gas Stack
Substructures 1   x
Superstructures 1   x
Oily Water Collection And Separation
Substructures 1   x
Heat Recovery Building
Substructures 1   x
Superstructures 1   x

 

Station Auxiliary Transformer Structures
Black Start Unit
Substructures 1   x
Station Transformer
Substructures 1   x
Superstructures 1   x
Cables From MV Room To Power Transformer
Structures
Substructures 1   x
Power Transformer Structures
Power Transformers
Substructures 1   x
Superstructures 1   x
PLATFORMS, SHELTERS AND OTHER STRUCTURES
Substructures – power transformer area 1   x
Substructures – day tank area 1   x
Substructures – fuel and oil unloading area 1   x
Substructures – station auxiliary transformer area 1   x
Substructures – pipe route between unloading station and storage tank area 1   x
Substructures – outdoor auxiliary area 1   x
Substructures – pipe route between storage tank area and fuel treatment house 1   x
Superstructures – pipe route between storage tank area and fuel treatment house 1   x
Substructures – pipe route between fuel treatment house, day tank area and engine hall 1   x
Superstructures – pipe route between fuel treatment house, day tank area and engine hall 1   x
 

Wartsila diesel generator

Wartsila 20V32 Diesel Generator

Wartsila 20V32 HFO Generator

Visit our other available generators

Related Products

Cummins Diesel Containerized Generators

Cummins Containerized Diesel Generators  Twenty (20) 1425 KVA Cummins KTA 50 G3 Diesel Sound Attenuated Containerized Power Packages, Dual frequency 50/60 HZ, year 2013 & 2014, all under 100 hours. Generators Diesel Power Packages are like new condition. Included in these packages lots of features that are . Included fuel...

Electricity Sale Wartsila Diesel Generator Plant 

Electricity Sale Wartsila Diesel Generator Plant  Electricity Sale Wartsila Diesel Generator Plant, 119 MW, seven (7) 17 MW Wartsila 18V46 diesel generators, 500 rpm, 50 HZ, 11000 volt, generator plant can operate on various fuels: HFO/LSHS/LSFO/LSWR, service records and documentation available. Maintained by OEM since new Electricity For Sale  If you...

Cummins KTA50 G3 Sound Enclosed Diesel Generators

Cummins KTA50 G3 Sound Enclosed Diesel Generators Cummins KTA50 G3 Sound Enclosed Diesel Generators, Total 26880 KW / 26.9 MW of  power, Model Cummins C1400 D5, Sound Enclosed Diesel Generator Plant. Twenty Four (24) Cummins  KTA50 G3 Diesel Engines with 1400 KVA/1120 KW Newage Stamford Frame P, 1734 B1 single...

Wartsila 105 MW Diesel Generator Plant

Wartsila 105 MW Diesel Generator Plant Wartsila 105 MW Diesel Generator Plant, Wartsila 18V46 diesel generators, 500 rpm, 50 HZ, 11000 volt, fuel: HFO/LSHS/LSFO/LSWR, service records and documentation available. Maintained by OEM since new Electricity For Sale – Build – Own – Operate If you require electricity and have funding constraints, then...

Perkins Diesel Generator Enclosed 9600 KW

Perkins Diesel Generator Enclosed 9600 KW Perkins Diesel Generator Enclosed 9600 KW, Diesel 50 HZ. Power generator plant consists of (9) Perkins Diesel Generator Enclosed Sound Attenuated Containerized Diesel Generator sets, Perkins engine models (8) 4012-46 TAG, (1) 2506C-E15 and Stamford Alternators.  Low hours since new, Also the package includes (4)...
Back to top